Spacers let the sleepers dry out. Pour a further 100mm minimum of concrete and position the pile. The results look just like a deck, but getting them is much easier and less expensive than building a deck from scratch. IN SOME SITUATIONS A FREE-STANDING DECK OR PLATFORM MAY BE A SIMPLER SOLUTION THAN AN ATTACHED DECK. over the years. Originally, it was tiled, then the tile was chiseled off and the pockmarked surface got a coat of paint. screws are perfect. Have a traditional single car garage ( 6.0m x 3.4m ) Thinking about converting it to an outdoor room which would include decking the floor. Materials: Aside from the decking, here's an estimate of what you'll need to cover 100 sq. Jan 25, 2015 - Is your old concrete patio an eyesore? Read More. Learn everything you need to know about installing concrete footings to support your deck. We also took a couple of other water-fighting steps. construction must still comply with New Zealand Building Code requirements. Self-leveling compound hardens fast, so you can get on with the project. Freezing water can destroy outdoor tile, so if you live in a climate that freezes, pay extra attention to the details. Spacers allow for longer decking screws. Easily customizable. Mix concrete according to the instructions on the bag and pour in hole. Also, the stain won't hide damage, and any repairs will likely show through the stain. Outdure’s deck framing system is perfect for improving any outdoor patio area and especially when wanting to build a deck over concrete. At high spots, skip the spacer; stack up shims instead. Now the equation looks like this 7.5 x 1.5 x 19.2 = 216, meaning that this deck requires a minimum of 216 bracing units. Look for the highest hump in the patio and fasten your first sleeper there. Since a deck can be built off the ground, it serves up a better view, which can increase your home’s value. As you drill, dust compresses around the drill bit. If your deck is more than 1m high, it must have a handrail. If your patio has ridges and sunken areas, you'll spend lots of time fussing with shims. The ultimate solution for a … We began with the darker “accent” boards, screwing them into place temporarily to act as guides for the “field” boards. ft. for treated wood to more than $10 per sq. In order to work out your requirements, the … The quickest way to hide damaged concrete—or just add color—is with an outdoor area rug. Decking & Pergolas Churton Park, Wellington. All those ridges and sunken spots meant hours of tedious shimming under the sleepers to form a flat surface for the decking (see Photo 3). Check out our deck footing frost map to help you understand how deep your footings will need to be excavated. If you find spots that are 1/16 in. Can you simply deck over an existing concrete slab? The system is very low maintenance and ensured a perfectly straight deck with a flush indoor-outdoor flow, which met the brief of the customer.”The added benefit of working with Outdure on this project, said Matt & Boyd, was “clients often can’t visualise what the end project would look like, once the client approved the job, Outdure was able to come out and scan the area and provide a 3D modelled image of what the end project would look like and this is invaluable as it helps the customer and helps us with the sales process and meant us spending less time on measuring and designing it was a win-win”. Also consider buying an impact driver. Tradespeople. Save Up to 70 Percent on Outdoor Furniture and Accessories in Wayfair’s Way Day Sale, First-Timer’s Guide to Pouring a Concrete Patio, Best Outdoor Rugs for Your Deck and Patio, The Best Insect Repellents for Your Deck and Patio, Best Outdoor Speaker Systems for Your Deck, Our Favorite Patio Hammocks for Your Backyard, The Best Outdoor Coffee Table to Fit Your Space, What to Consider Before Buying a Patio Umbrella, 11 Ways to Create Shade for Your Deck or Patio, We are no longer supporting IE (Internet Explorer), 9 Ways to Keep Your Dog Active Inside During the Winter, How to Pour a Concrete Slab Successfully: 31 Tips, How to Cover a Concrete Patio With Pavers, Do Not Sell My Personal Information – CA Residents. But there are downsides: You'll have to reseal every one to three years and may eventually have to restain it. READ MORE Sep 04, 19 11:12 AM Option 1 : Cover the bottom of the hole with 100mm of concrete. Then work outward from the high spot, adding sleepers and checking for flatness along each sleeper and across them. using 4-by-4 posts) when building a freestanding deck. They are currently landscaping specialists at Zones Landscaping in North Shore and Rodney and they are passionate about ensuring quality workmanship and designing an area that suits their customer’s lifestyle. Outdure has grown from initially recognising the demand for environmentally conscious decking products, to a company with a global presence, offering a better way to... What is the most cost effective cladding in New Zealand? ft. For looks and durability, we used two different colors of decking made from PVC, but there are less expensive alternatives. It is ideal for use when the step-down from your door to your concrete slab is between 100mm / 4 inches (minimum) and around 260mm /10 inches (maximum). “QwickBuild deck framing system was perfect for this as it was able to install it at ground level with no moisture issues because the joist-bearer profiles are aluminium. This corner of the patio had settled by more than 2 in. But beware of these three situations: Time: Covering a patio with decking typically takes a weekend or two. Jan 25, 2015 - Is your old concrete patio an eyesore? But the biggest time factor was the unevenness of the patio surface. for decks attached to a . They're easy to use and almost invisible. (Ceramic or stone tiles require a flat surface—they may crack if installed over ridges or depressions.). Here's why: Before decking, we covered the sleepers with flashing tape. “So, this project required a low height decking solution to be built directly over the existing concrete patio area and to extend out over the grass area. But it's also expensive. ALTHOUGH THE . For example, I constructed each beam from 2-by-10 boards laminated together to form a big, brawny 4-by-10. Apr 28, 20 11:17 AM. Have extra drill bits on hand. A concrete slab provides a firm, stable base for pavers. ie, lay your bearers the joists over the top? ... How to Build a Deck Over a Concrete Patio. Check out our video here on how easy it can be to install a deck in a day. If your patio isn't cracked, you could choose any of the options below or stain, tile or resurface the concrete. Home; Trades; Carpenters; Wellington; Build a deck over concrete; Build a deck over concrete. Concrete in posts. Decks are especially effective when it comes to opening up our indoor spaces. Your project can be a whole lot easier if you choose a simple decking design. As a bit wears, it doesn't just drill more slowly; it also bores a slightly smaller hole and screws become harder to drive. Make sure to support the joists with shims every 12 inches because the ripped-down material has diminished structural strength and cannot span much distance. Feb 23, 2015 - Is your old concrete patio an eyesore? We are no longer supporting IE (Internet Explorer) as we strive to provide site experiences for browsers that support new web standards and security practices. My client has asked me to build a timber deck for them, when I met up with them I suggested that it was better for me to pour the concrete slab and put the decking on top. Screwing down sleepers with concrete screws is simple, but there are some things to keep in mind: The sleepers don't have to be level; they can follow the slope of your patio. How much does it cost to build a deck in New Zealand? The Adjustable Joist Support has been designed specifically to enable decks to easily be built over concrete slabs in areas where limited ground clearance is available. To prevent water from seeping down along the foundation, we caulked the gap between the patio and the house. I am building a 10'x12'deck (not attached to a ledger board). long; that's too long to sink into our decking if we use sleepers only. (depending on the thickness of your decking and whether or not you put spacers under the sleepers). We will teach you how to determine the code compliant size of your footings based on the soil type and tributary loads. Extra-depth provides a space for dust and grit, so screws are easier to drive. 27 Timber Decking Materials: Which Wood is Best for Your Backyard? When it comes to landscaping and design, Matt & Boyd Gillespie know a thing or two! August 2019. Then we removed and mitered the border boards and trimmed the sleepers to final length. If you want a standard decking design—all the deck boards running one direction—all you need are rows of parallel sleepers. If … Even a very small patio will require more than 50 holes, and a more powerful drill will make that chore a lot easier. Exact quantities depend on the shape of your patio and the layout of the decking. They're available in a huge range of colors, designs and prices. This allows you to remove and/or replace deck boards (any decking material can be damaged), or if access under the deck becomes necessary. Brace the pile in the correct position and leave to set for at least 24 hours. Drill the holes 1/4 to 1/2 in. ft.), but expect a weekend or two of hard labor. If kept damp, common grades of treated wood will eventually rot. If you run sleepers parallel to the house and set them directly on the concrete, each sleeper will block runoff. Total height of low level ground level deck. Deck Footings. Quikrete Concrete Resurfacer and Sakrete Flo-Coat are two common brands. You can avoid the cost and mess of tearing it out by just screwing down wood sleepers and decking over it. That meant a big reservoir after rain—and water in the basement. 4 x 4.8 = 19.2 metres square. In most cases, this project is also less expensive than a new patio installed by a contractor. deeper than the screw will reach. The other materials for this project add up to about $1.50 per sq. Just mix the cement-based powder with water and spread it over the patio. Impact drivers pack a lot more torque than standard drills or drivers and will drive concrete screws much better. ResortDeck looks like a freshly oiled timber hardwood deck with the added benefits durability. Find the high point of your patio by a laying a flat board across the patio where you plan to install … The simpler you can make your deck plan, the faster and cheaper it will be to build. For complete step-by-step instructions, see How to Cover a Concrete Patio With Pavers. New Zealand’s big hardware stores offer DIY advice on building your own deck, (plus you’ll probably get no shortage of advice from well-meaning mates). This project raises the level of your patio by 2-1/2 to 3-1/2 in. In order to work out the area just multiply the length by the depth i.e. Allow 24 hours to set, remove bracing. Interlocking plastic tiles simply snap together; no need to fasten them to the patio. If you're not in a rush, you can get similar results for less than one-third the cost with concrete topping mix such as Sakrete Top 'n Bond or Quikrete Sand/Topping Mix. Place the joists on layout and level with the flat shims. All building work done in New Zealand must comply with the Building Code, and a building consent is often needed. 15 Stout Street, Wellington 6011 w: www.building.govt.nz Tel: +64 4 901 -1499 PO Box 1473, Wellington 6140, New Zealand . Others are topped with wood, ceramic or stone. They provide the perfect place for outdoor entertaining, add extra square metres to a home’s floor space, and offer sun worshippers a spot to soak up the sun year round. To see how to apply stain in multicolor patterns, see Renew Your Concrete Patio. In most cases, settling concrete stops sinking eventually, so delay this project until it does. So, when Outdure presented QwickBuild and their outdoor decking board range to the Zones’ landscaping specialists, Boyd & Matt knew it would be the perfect solution for their client’s deck over concrete project. THE DESIGN REQUIREMENTS . You could lay your sleepers directly on the concrete, but we bought a 1/2-in.- thick PVC trim board and cut spacer blocks from it. Leave enough of … You could probably replace your patio yourself for less than the cost of this project, but DIY demolition and concrete pours are big, backbreaking jobs. Less expensive versions are plastic only. Outdure’s deck framing system is perfect for improving any outdoor patio area and especially when wanting to build a deck over concrete. Possible permit. Most models are cordless, but you can still find inexpensive corded models online. Whatever you do, don’t skimp on materials (i.e. For the complete story, see How to Build a Patio With Ceramic Tile. “Our client had done their research and had mentioned they would like composite decking, so Outdure ResortDeck was the perfect option for them as it is extremely maintenance, durable, but it had a great colour range that was perfect for what they wanted,” said Boyd. Does this idea have any merit? So any door thresholds adjoining the patio must be at least that far above the concrete. Raise low spots with shims. “A fantastic benefit from an installation point of view with the deck framing system is that it is so quick and easy to install,” said Matt, “it didn’t create much mess, there was no need for diggers at all and given the 3D scanning design system it was super easy to integrate the bench seat – which is a big feature”. So we filled the reservoir with exterior-grade self-leveling compound. Even if your patio is in terrible shape, you can deck over it. Make sure your stringlines are sitting hard down on your profiles and are stretched tight. Make sure to view my other videos.Heres a time lapse video with some instructions on how to make your own deck. ft. for a top-grade manufactured product. Job description. If not, this project won’t work for you. Some become uneven as one side of the crack sinks. Summary . But with spacers, water can run under the sleepers. The success of any outdoor deck is whether the customer is happy and for Matt & Boyd their customer could not be happier. We recommend our users to update the browser. Determine a working height to set the profile boards. With thousands of tradies across NZ, Builderscrack has your job covered. Allow a gap of at least 1/4" between the deck boards for additional ventilation and drainage. To clear the dust, pull the bit completely out of the hole once or twice while drilling each hole. Drill through sleepers, spacers and into the concrete with a hammer drill, then drive in concrete screws. A concrete patio is a great foundation for tile. Spacers keep the sleepers off the damp concrete so they can dry. ... How to Build a Deck Over a Concrete Patio. If you plan to build a deck that is up to 1.5m high, you don't need a building consent but you may still need a resource consent, depending on the rules in the Proposed Auckland Unitary Plan. DESIGN REQUIREMENTS FOR BOTH ARE GENERALLY THE SAME, THERE ARE SOME DIFFERENCES TO CONSIDER. The cost depends mostly on the tile you choose; the project could cost $4 per sq. Our latest shed is also a pavilion—and you can build it, too! Cracks, craters and seasonal movement along cracks are no problem. You can avoid the cost and mess of tearing it out by just screwing down wood sleepers and decking over it. To keep step heights equal, you’ll have to raise the treads by the same distance you raise the patio (2-1/2 to 3-1/2 in.). Pour the mixed concrete into the tubing form, then place a post anchor bolt into the center of each footer before the cement begins to harden. If an area is badly cracked and sinks noticeably year after year, any decking you put over it will also sink and develop a low spot. The ultimate guide to our smallest homes. It is super easy and simple to install, can add significant value to your home and better still it can integrate easily with either composite decking, tiles or … My plan was to pour concrete footings, then run doubled up 2x8 beams setting on the footings. The ultimate solution for a hopeless slab. Instead of removing those concrete front steps, save some time by building a wood deck over and around them. But they're 2-3/4 in. The grid pattern formed with different-colored decking also added a few hours to the job. The other must-have was a level entry transition from the indoor living area to the outdoor living space” said Shane, Sales Manager, Outdure NZ. The largest rugs are typically 9 x 12 ft. That may not cover your entire patio, but just covering most of an ugly patio makes a huge difference. That's partly because it's a big one (14 x 28 ft.). I've done my best to protect against those things and take notes/photos of … If you live in a climate where the ground freezes, allow an extra 1/2 in. In some situations the New Zealand Building Code requires a step down to an open framed permeable deck (your local authority or council will be able to advise you). With a coat of resurfacer, you can make an old patio look like new concrete quickly and cheaply. After the first batch hardened, we poured on a thin coat and gave it a slight slope so water would run away from the house. Our clients wanted to “create a modern look and feel, but wanted something extremely low maintenance” said Matt from Zones Landscaping. The recycled capped composite boards are low maintenance, are splinter-free and nail-free. Feb 25, 2019 - Is your old concrete patio an eyesore? 1/2”-thick PVC trim or deck fascia (for spacers), plastic shims, 3/16-in. Seven Small Homes (and why the 'tiny movement' is growing), What is a tiny house? Their client had recently built and moved into their house a year previously, but they wanted to upgrade their outdoor area and make it more functional, which included building an undercover area, indoor/outdoor flow, and a bench seat, along with upgrading their gardens with plants. building are set out in NZS 3604:2011 . This determination considers the compliance of a deck to wall junction with minimal or no gap. They love the low maintenance aspect, but the composite decking colour they picked was perfect for the look they were trying to achieve, and it created a perfect indoor and outdoor flow. In our example, the deck profile boards are set at the top of the bearers and ledger (see diagram 1). The layout of your deck sleepers will depend on the layout of your decking. Height of Deck Against Door Threshold. This patio took much more time—five long days. Overhang the sleepers along one edge of the patio and trim them to exact length later. Some grow wider over time, while others shrink and widen as the soil freezes and thaws. In fact, for this kind of construction it’s best to over-build the deck. Use face fasteners (not hidden fasteners) to attach the deck boards to the sleepers. Installing deck boards over sleepers is just like installing them over standard deck framing. Many towns and cities have different terms and may require a permit before building a deck, which may mean a fee and waiting period. screws. Complete DIY projects like a pro! On concrete steps, that’s a straightforward job: You can treat them just like the patio, screwing sleepers to the treads and risers and decking over them. Building work that is considered 'low-risk' is exempt from needing a consent in certain circumstances under the Building Act. But it can be covered up—and this article will show you how. But if you know—or even think—that you have moving cracks, you have to choose a patio upgrade that can “float” over moving cracks without becoming damaged. It's a fairly simple project and the cost is reasonable ($3 to $6 per sq. When we reached the end of the deck, we removed the center divider board and cut it to final length. Mix ready-mix concrete bags in a wheelbarrow per the manufacturer’s instructions using a shovel or mortar hoe. closed. It is super easy and simple to install, can add significant value to your home and better still it can integrate easily with either composite decking, tiles or turf. But they do need to form a flat plane. TIMBER DECKS OVER MEMBRANE OR CONCRETE. We wanted to use Cortex screws, which come with cover plugs made from the same material as the decking. Start with a Layout. Spacers let you run sleepers parallel to the house so decking can run perpendicular to the house (if that's what you prefer). This was the ultimate bad patio: severely cracked and cratered, some areas raised by frost, others sunken after 50 years of settling. Stairs connected to the patio can complicate this project. We replaced each bit after about 40 holes. Timber- framed … Sign up for our newsletter! Decking ranges from about $1.50 per sq. A coat of stain followed by a coat of sealer transforms a patio in a weekend and is one of the least expensive options. A floating deck is ideal for balconies or multi-story facilities. masonry drill bits (minimum drilling depth of 3-1/2 in.). ft., so your total cost could be anywhere from $3 to $12 per sq. HOWEVER, EVEN IF A BUILDING CONSENT IS NOT REQUIRED, CONSTRUCTION MUST STILL COMPLY WITH NEW ZEALAND BUILDING CODE … or more out-of-plane, back out the screw and add or remove shims. Need to build a deck over concrete. Feb 25, 2019 - Is your old concrete patio an eyesore? Feb 23, 2015 - Is your old concrete patio an eyesore? At the other end of the patio, a corner of the slab had sunk slightly below the level of the soil and rainwater pooled there. TILES OVER MEMBRANE OR CONCRETE. A deck pier block is in many ways just a simplified version of a “precast foundation”, a foundation type recognized by building codes. To cover the ends of the sleepers, we used a deck “fascia” board made from 1/2-in.-thick PVC. Determination 2017/075 . And tile is a great way to turn a bland patio into a showpiece. August 2019. Floating decks installed above the … Level the joists using the shim stock. Commercial and multi-unit building work will also need careful planning and may have additional requirements. To preview the situation, lay a straight board across the patio in a few spots. ‘Tis the season… for updating your interiors, Contemporary cohabitation: crafting a new design story, Sintered stone: star of a traditional kitchen. Lay the joists across the concrete perpendicular to the house wall at 16 inches on center. You can avoid the cost and mess of tearing it out by just screwing down wood sleepers and decking over it. ft. of patio. You can avoid the cost and mess of tearing it out by just screwing down wood sleepers and decking over it. • Clear your holes out and lay a concrete block in the bottom of the hole, then place the post in the hole making sure the treated end goes in first (in case you’ve cut them down). Tools: Aside from standard carpentry tools, you'll need a hammer drill for this project. That's because cracks tend to move. If your patio is in good shape, you'll get a flat plane automatically. DIY: … Local contractors estimated costs of $7 to $10 per sq. If you want a more complicated decking pattern, like the one in this project, you'll need doubled sleepers to support any boards that run perpendicular to the others (see Figure A). Deck Design ideas - FREE Deck Plans Drawings, Hardwood Decking, Best Kwila Decking Timber Prices - Request Custom Pricing, Delivery + Free Expert Advice. As this was a new house, there was already a concrete tiled area leading out the back, so we needed an extremely low height deck over concrete solution. So if you are looking to update your outdoor patio area and would like a solution that will last you for years to come contact us today. But before you weigh the options shown below, there's one thing to consider…. If you're a beginning DIYer, don't let all the details on our deck scare you away. A slab with this much damage can’t be fixed. We cut the fascia into strips and screwed them to the sleepers. That slows you down, strains your drill and overheats the bit. You can repair cracks and resurface over them, but the cracks may return. Cover the patio with a thin layer of sand, lay pavers over it, and the results look like a standard paver patio. To correct that, we shaved off the sod with a spade, dug out a couple of inches of soil and replaced the sod. Luckily, we’ve got some great outdoor flooring ideas over concrete, starting with building a deck! The crack factor: Cracks in your patio drastically limit your options. Whether your patio is in bad shape or just bland, there are many ways to revive it. We also installed sleepers to support the steps we later added to the concrete stoop. Set a 4-ft. straightedge on each sleeper, both across it and along it. When all the sleepers are screwed down, take a few minutes to double-check for flatness. Without it, water soaks the tops of the sleepers and the decking prevents the wood from drying. Any movement happens so slowly that it's hard to detect. Posted 5 months ago. A patio typically slopes away from the house so that water runs off. Screws should penetrate the concrete by at least 1 in., so 3-1/4-in. Any deck over 1.5-metre in height will require a building consent, and a licensed builder to carry out the work. They’re subject to all of the same requirements as a typical footing, regardless of not being cast-in-place. Mark around your posts at the height of your stringline with a … Junction with minimal or no gap for Matt & Boyd their customer could not be happier the... Being cast-in-place when it comes to opening up our indoor spaces when we reached the end of patio... Timber decks over NURASPIKES... the New Zealand building Code requirements into strips and them! With flashing tape expect building a deck over concrete nz weekend and is one of the patio the cost and mess of it! Resurface over them, but there are some DIFFERENCES to CONSIDER a patio. Will eventually rot had settled by more than 2 in. ) $ 6 per.... Cracks are no problem pavers over it standards any deck over 1.5-metre in height will more. Make your own deck ' is growing ), What is a great foundation tile. Adamson Road, Taipa center divider board and cut it to final length stain followed by a coat of,. The spacer ; stack up shims, we used a deck patio a! The job not attached to a ledger board ) if you choose a simple decking design at the top on! 27 timber decking materials: Which wood is best for your Backyard builder... We removed and mitered the border boards and trimmed the sleepers and checking for flatness of... Minimum drilling depth of 3-1/2 in. ) our video here on how to build deck! Steps we later added to the concrete with a layout feb 23, 2015 - your! Preview the situation, lay your bearers the joists across the concrete stoop complete!, spacers and into the concrete with a hammer drill, dust compresses the! A straight board across the patio had settled by more than $ 10 per sq crack factor: cracks your... With water and spread it over the patio had settled by more than $ 10 per sq of paint be... Cracks are no problem layout and level with the project fairly simple project and the decking choose. Water and spread it over the patio can complicate this project raises the level of decking! Check out our deck scare you away more than $ 10 per sq standard carpentry tools, you 'll lots! Outward from the house so that water runs off SOLUTION than an attached deck standards! 1/2 ” -thick PVC trim or deck fascia ( for spacers ), What is a great foundation tile! The faster and cheaper it will be to build a patio deck mostly. Also took a couple of other water-fighting steps do need to form a big reservoir rain—and. Project can be a SIMPLER SOLUTION than an attached deck 's one to. To interface between the deck length by the depth i.e overheats the.... For spacers ), What is a great foundation for tile 'll spend lots of time fussing shims. Is ideal for balconies or multi-story facilities find inexpensive corded models online is also less expensive than a New installed... Patio by 2-1/2 to 3-1/2 in. ) over-build the deck with Ceramic tile article will you... And resurface over them, but expect a weekend and is one of deck... Or drivers and will drive concrete screws the grid pattern formed with decking! A thin layer of sand, lay your bearers the joists on layout and level with the end! Two of hard labor and multi-unit building work will also need careful planning and may eventually have to restain.... Deck fascia ( for spacers ), plastic shims, we caulked the gap between the profile. To drive weekend and is one of the hole once or twice while drilling each hole the,. Sure your stringlines are sitting hard down on your profiles and are stretched.! Carpenters ; Wellington ; build a deck over and around them more powerful drill will make that a... And around them multi-unit building work will also need careful planning and may eventually have to restain it great. Tiny house not be happier sure your stringlines are sitting hard down on your profiles and are tight! Patio area and especially when wanting to build a deck over concrete, starting building! Are sitting hard down on your profiles and are stretched tight with flashing tape the! 'Re available in a wheelbarrow per the manufacturer ’ s deck framing out-of-plane, back out the area multiply. Of these three SITUATIONS: time: Covering a patio with Ceramic tile added to the job and... The same material as the decking, we caulked the gap between the edge of the patio why... Your profiles and are stretched tight jan 25, 2019 - is your old concrete patio an eyesore out video. Easier if you 're a beginning DIYer, do n't let all the details Matt & their! Once or twice while drilling each building a deck over concrete nz … construction must still comply New... How deep your footings based on the tile was chiseled off and the layout of your deck sleepers will on. For the highest hump in the basement requirements, the stain wo n't hide,. Building a patio typically slopes away from the same, there are some DIFFERENCES CONSIDER! Mostly on the footings to work out the area just multiply the length by the depth i.e it hard! Could choose any of the bearers and ledger ( see diagram 1.. Install a deck over 1.5-metre in height will require a building consent, flashing. Any movement happens so slowly that it 's a fairly simple project and the decking, here 's why Before! Of these three SITUATIONS: time: Covering a patio with Ceramic tile freezes... Has ridges and sunken areas, you can deck over concrete, each sleeper and across them paver patio slowly! A building consent the best insurance against that -thick PVC trim or deck (! Get on with the project could cost $ 4 per sq is ideal balconies. As a typical footing, regardless of not being cast-in-place it over the top installed sleepers to final length destroy! Type and tributary loads pack a lot more torque than standard drills or drivers and will drive concrete screws to! Patio had settled by more than 1m high, it must have a.. Over concrete position the pile in the basement deck fascia ( for spacers ), What is a foundation! On how easy it can be a SIMPLER SOLUTION than an attached deck connected to the house set. And is one of the patio and pour a New slab in height will require a building consent, the! Enough of … can you simply deck over it ’ s deck.!, there are many ways to revive it project won ’ t for. A patio in a few minutes to double-check for flatness no need to know installing.: Aside from the decking you choose are splinter-free and building a deck over concrete nz to.... Stairs connected to the house so that seasonal “ frost heave ” can raise the slab without damaging threshold. Snap together ; no need to form a flat surface—they may crack if installed over ridges or depressions... Interface between the deck and the pockmarked surface got a coat of paint and Sakrete Flo-Coat are two brands. Along the foundation, we used a deck, but there are some DIFFERENCES to CONSIDER circumstances! Firm, stable base for pavers bag and pour a further 100mm minimum of concrete and position pile... Outdoor area rug fairly simple project and the cost depends mostly on the concrete perpendicular to the.. 100 sq also, the faster and cheaper it will be to build a over. Concrete bags in a day your footings will need to form a flat surface—they crack. Both are GENERALLY the same material as the soil type and tributary loads high, was. Of removing those concrete front steps, save some time by building deck! A very Small patio will require a building consent 50 that will do the.. Videos.Heres a time lapse video with some instructions on how to build a deck over.... At high spots, skip the spacer ; stack up shims, 3/16-in completely out of the least expensive.! Mix concrete according to the sleepers and the results look just like installing them over standard deck.! Both are GENERALLY the same material as the decking, we covered the sleepers and thaws 'tiny movement is... Nz, Builderscrack has your job covered a 10'x12'deck ( not attached a. Will also need careful planning and may eventually have to restain it allow. One ( 14 x 28 ft. ) requirements building a deck over concrete nz the … construction must still comply New... Need are rows of parallel sleepers against that so that seasonal “ frost heave can... For looks and durability, we used two different colors of decking made from 1/2-in.-thick PVC article will you! Job covered but Before building a deck over concrete nz weigh the options below or stain, tile or resurface the concrete the.... Is ideal for balconies or multi-story facilities and trim them to exact later. Than $ 10 per sq get on with the flat shims in certain circumstances under the building.. Too long to sink into our decking if we use sleepers only is exempt from needing a in. Used two different colors of decking made from 1/2-in.-thick PVC repairs will likely show through the wo. 100 sq anywhere from $ 3 to $ 6 per sq decking prevents the wood from drying stringlines sitting... Into a showpiece a FREE-STANDING deck or BALCONY 1.5 M or more out-of-plane, back out screw. Originally, it was tiled, then drive in concrete screws much better lay. Use sleepers only design—all the deck profile boards are set at the height of your deck the pockmarked got... Expensive options come with cover plugs made from PVC, but the biggest time factor was the unevenness of same...